HVAC ANSWERS TO HVAC LICENSING PRACTICE B ACK TO TEST
If you would like to have more HVAC practice questions, please CLICK HERE to purchase 150 practice questions that will cover the whole gamut of question types. The cost is a measly $40. We also offer a complete self-study HVAC prep course HERE.
- c Table 305.4 IMC
- b nascla business
- c section 406 (5 x test pressure)
- c section N1103.3.6 Residential code
1500 sq. ft. / 100 = 15
15 x 4 =60 cfm
NOTE: the 2009 and
- a section 909 IMC
- d section 402.7 IFGC
- c 506.3 IMC
- 6 x 10 = 60, 60/.75 =80″
- c 503.10.9._ gas code
- c 404.17.1 Limitations. IFGC
- d Table 401.5 IMC
- d Section 506.3.13.1 IMC
- c still air surface = .68
gypsum = .45
air space = .91
gypsum = .45
still air surface = .68
Total R = 3.17
U = 1/3.17 = .315
wall is 240 square feet (30 x 8)
BTUH = area x U x td
240 x .315 x 20 = 1512 (close enough)
- b 302.3.2 gas code
.33 x 9.5 =3.13
- a. See Table 403.3.1.1. 15000/1000 = 1.5, 1.5 x 50 people = 75 people may occupy this room, 5 CFM out door air required per person, therefore 75 people x 5 CFM = 375 CFM required
- c $75,000/.15 = $500,000
- c section 506.3.1.1 IMC
- a 404.12.1 gas code
- d section 306.3 IMC
- a 304.5.1 GAS CODE IFGC 75000/1000 = 75, 75 x 50 = 3750 cubic feet
Welcome! It’s your first time on this page, and we are glad to have you.